 |
Atlanta Public Schools
- Security System Design: CCTV | Access Control | Life Safety
- 5000 Cameras: Engineering | Drawings | Vendor Management | Integration
- Central Control Center: System Design | Integration | Staffing|Monitoring
- 1000 Door Readers: ID Credentialing | 10,000 Cards | Master Database
- $1.5 Billion Construction: QC | Security|Technology | Integration | EMS
- A/E Drawings: AutoCAD | Detailed Take-Off | Final As-Built
- Network Infrastructure: Fiber | Wireless | Copper | Inside/Outside Design
- Facilities Systems: Maintenance | Vendor Coordination | Monitoring
|
 |
Applied Computer Services
- CCTV System: Design | Installation
- Camera Configuration: IP Address | Electronic Integration
- Equipment & Material: Hardware | Software |Miscellaneous Material
- Infrastructure Cable: Installation | Testing
- Final As-Built Drawings
|
 |
Cantebury Retirement Facility
- Access Control System Installation
- Door Wiring & Integration
- Troubleshooting
- Employee Badge Validation & Verification
- Maintenance
|
 |
City of Atlanta Safety Annex
- Life Safety & Security: Fire | Burg | CCTV | Access Control
- Program Management: Staffing | Davis Bacon | Quality Control
- System Integration: CCTV | Access Control
- Document Management: Drawings | AutoCAD
- Equipment: Purchase | Program | Install
- Project Closeout: Test | Commissioning | Launch
|
 |
City Schools of Decatur
- LAN/WAN Management: MDF/IDF | Cable | Fiber | Electronic Equipment
- A/E: Drawings | Data/Voice Placement | Technical Specifications
- Quality Control: NEC | ANSI | IEEE | BICSI
- Vendor Management: New Construction | Renovation | Upgrade | MAC
- Utility Service: Fiber | Ethernet | Copper | Wireless | Video
- Electronic Equipment: Switches Hubs Routers UPS
- Documentation: Testing | Cross Reference | Patch Panel | Numbering Scheme | As-Built | Warranty | Certifications
|
 |
Convergint Technologies
- CCTV System: Design, Installation, 100 IP Cameras
- Camera Configuration: IP Address, Electronic Integration
- Equipment & Material: Hardware, Software, Miscellaneous Material
- Infrastructure Cable: Installation, Testing
- Final As-Built Drawings
|

|
DeKalb County School System
- LAN/WAN Management: MDF/IDF, Cable, Fiber, Electronic Equipment
- A/E: Drawings, Data/Voice Placement, Technical Specifications
- Quality Control: NEC, ANSI,IEEE ,BICSI
- Vendor Management: New Construction, Renovation, Upgrade, MAC
- Utility Service: Fiber, Ethernet, Copper, Wireless, Video
- Electronic Equipment: Switches Hubs Routers UPS
- Documentation: Testing , Cross Reference, Patch Panel, Numbering Scheme, As-Built, Warranty , Certifications
|
 |
Fulton County Public Schools
- CCTV Security Design: Engineering, Drawings , Vendor Management
- Technical Specifications: GE Cameras, DVR, NVR
- Survey current conditions
- RFP Management: Pre-bid, Site Assessment, Bid Review
- A/E Drawings: AutoCAD, SharePoint, Final As-Built
- Vendor Management: Installation, Integration , Testing , Launch
|
 |
Jones Lang LaSalle
- Access Control System Installation
- Door Wiring & Integration
- Troubleshooting
- Employee Badge Validation & Verification
- Maintenance
|
 |
Savannah Chatham County Public School System
- Security System Design: CCTV
- 1000 Cameras: Engineering, Drawings , Vendor Management
- Technical Writing: CCTV, Fire, Intrusion Alarm, Access Control
- Solicitation Management: Vendor Selection
- A/E Drawings: AutoCAD, Detailed Take-Off , Final As-Built
- Vendor Management: Integration, Testing, Launch
- Security Risk Assessment: 56 Facilities
- Emergency Management Site Plans: 56 Facilities
|